Latest News

Opening Of Polyclinics In Sembawang & Khatib Delayed By A Year Due To Supply Chain Disruption

MOH Delays Opening Of New Polyclinics In Sembawang & Khatib, Cites Supply Chain Disruptions

A series of supply chain disruptions and manpower shortages in the construction sector have affected several major construction projects in Singapore.

Among them are the new polyclinics in Sembawang and Khatib. Previously announced to open in 2022 and 2023, the clinics will be operational one year later than their expected date instead.

There will be a delay in the construction of the new National Skincare Centre (NSC) and redeveloped Jurong Polyclinic as well.

Opening of new polyclinics in Sembawang & Khatib delayed

According to a written parliamentary answer by Health Minister Ong Ye Kung, the opening of new polyclinics in Sembawang and Khatib will be delayed.

Both clinics were set to open in 2022 and 2023, respectively. Instead, Sembawang Polyclinic will now open in 2023, and Khatib Polyclinic in 2024.

The redevelopment of Jurong Polyclinic and the construction of a new nursing home have also experienced a delay of two years. The two establishments will be operational in 2027.

In addition, the new NSC building will be open in 2023 instead of 2022. In the meantime, NSC’s services will be accessible from its existing centre.

Mr Ong has cited supply chain disruption and manpower shortages in the construction sector as reasons for the delays.

New healthcare centres to have a higher operating capacity

Channel NewsAsia (CNA) reports that the new Sembawang Polyclinic will be a part of the Bukit Canberra integrated hub.

 

Meanwhile, Khatib Polyclinic will be next to Khatib MRT station. Former Nee Soon MP Lee Bee Wah said in 2019 it would provide more convenient care for residents.

Currently, Yishun Polyclinic is the only polyclinic in the area. It has the second-highest median waiting time of all polyclinics in Singapore.

Also in 2019, the Ministry of Health (MOH) announced the move of Jurong Polyclinic to a new site double its current size, expecting it to be ready by 2025.

The existing polyclinic will continue serving patients until the new clinic is ready to operate.

As for the new NSC building, it will be 10 storeys high with two basement levels. NSC added in 2018 that the centre would increase its current clinic capacity by 50% with 69 consultation rooms, up from 46.

MOH earlier reported that it planned to increase the number of polyclinics in Singapore to 32.

Have news you must share? Get in touch with us via email at news@mustsharenews.com.

Featured image adapted from the Ministry of Health.

Sudeshna Dhar

Sudeshna is a lover of all romcoms, especially Gone Girl (2014).

Recent Posts

Underage teen in S’pore buries stillborn in house yard, police digs up bones during investigation

The coroner said this was the first case of its kind he had encountered in…

23 Dec 2024, 7:05 pm

M’sia Airlines grounds new Airbus just days after maiden flight, cites technical issues

The brand-new jet suffered a series of technical issues since its first-ever flight on 19…

23 Dec 2024, 6:17 pm

Family in S’pore finds snake on side view mirror mid-drive, netizens quip ‘Snake Year is coming’

The Paradise Tree Snake may have misjudged its landing and ended up on the car.

23 Dec 2024, 4:48 pm

69-year-old man dies after fight with 71-year-old neighbour over bumping into each other

The 69-year-old was reportedly upset over his neighbour's refusal to apologise.

23 Dec 2024, 4:33 pm

Bloomberg issued POFMA order over S’pore GCB transactions article, Govt addresses ‘falsehoods’

False claims include that GCB transactions occur without government checks on beneficial owners' identities.

23 Dec 2024, 3:35 pm

Woman set on fire aboard New York subway train, suspect allegedly watches her burn

The suspect casually watched as the woman became consumed by flames.

23 Dec 2024, 3:14 pm