Latest News

Opening Of Polyclinics In Sembawang & Khatib Delayed By A Year Due To Supply Chain Disruption

MOH Delays Opening Of New Polyclinics In Sembawang & Khatib, Cites Supply Chain Disruptions

A series of supply chain disruptions and manpower shortages in the construction sector have affected several major construction projects in Singapore.

Among them are the new polyclinics in Sembawang and Khatib. Previously announced to open in 2022 and 2023, the clinics will be operational one year later than their expected date instead.

There will be a delay in the construction of the new National Skincare Centre (NSC) and redeveloped Jurong Polyclinic as well.

Opening of new polyclinics in Sembawang & Khatib delayed

According to a written parliamentary answer by Health Minister Ong Ye Kung, the opening of new polyclinics in Sembawang and Khatib will be delayed.

Both clinics were set to open in 2022 and 2023, respectively. Instead, Sembawang Polyclinic will now open in 2023, and Khatib Polyclinic in 2024.

The redevelopment of Jurong Polyclinic and the construction of a new nursing home have also experienced a delay of two years. The two establishments will be operational in 2027.

In addition, the new NSC building will be open in 2023 instead of 2022. In the meantime, NSC’s services will be accessible from its existing centre.

Mr Ong has cited supply chain disruption and manpower shortages in the construction sector as reasons for the delays.

New healthcare centres to have a higher operating capacity

Channel NewsAsia (CNA) reports that the new Sembawang Polyclinic will be a part of the Bukit Canberra integrated hub.

 

Meanwhile, Khatib Polyclinic will be next to Khatib MRT station. Former Nee Soon MP Lee Bee Wah said in 2019 it would provide more convenient care for residents.

Currently, Yishun Polyclinic is the only polyclinic in the area. It has the second-highest median waiting time of all polyclinics in Singapore.

Also in 2019, the Ministry of Health (MOH) announced the move of Jurong Polyclinic to a new site double its current size, expecting it to be ready by 2025.

The existing polyclinic will continue serving patients until the new clinic is ready to operate.

As for the new NSC building, it will be 10 storeys high with two basement levels. NSC added in 2018 that the centre would increase its current clinic capacity by 50% with 69 consultation rooms, up from 46.

MOH earlier reported that it planned to increase the number of polyclinics in Singapore to 32.

Have news you must share? Get in touch with us via email at news@mustsharenews.com.

Featured image adapted from the Ministry of Health.

Sudeshna Dhar

Sudeshna is a lover of all romcoms, especially Gone Girl (2014).

Recent Posts

Serangoon HDB flat sold for S$1.208M, becomes most expensive unit in the estate

Prices in Serangoon are rapidly escalating, with a 7.01% increase in the average price this…

29 Mar 2024, 3:29 pm

Scissors penetrate Thai girl’s skull after 4-year-old brother throws them to imitate TV show

The depth of penetration was 2.54cm, or an inch. 

29 Mar 2024, 2:25 pm

Mother of US toddler who died after being left alone for 10 days gets life imprisonment

The judge said she committed "the ultimate betrayal".

29 Mar 2024, 12:25 pm

Expats find S’pore too costly to live in: Many are feeling the pinch & want to leave

Despite the country being an attractive place to live in, elevated costs are causing many…

29 Mar 2024, 10:20 am

S’pore checkpoints see massive jams before Good Friday long weekend with more than 4 hours’ wait

The queue at Tuas was four hours and 40 minutes long at 11.16pm.

29 Mar 2024, 7:23 am